The foundation work was awarded to a TREVIICOS lead joint venture, DC Slurry Partners.  It consisted of 95 slurry wall panels with a thickness of 36 and 42 inches and depths of up to 123’ deep, 142 drilled shafts 5, 6 & 7 ft. in diameter, with depths exceeding 150’.
The slurry wall will act as support of excavation and water cut off, while drilled shafts will facilitate the top-down construction method selected.
            
            
        