When the only requirement is to construct a continuous, watertight barrier, capable of accommodating some movements and deformations, the use of slurry walls filled with plastic concrete is the preferred method.
This method has been applied extensively for dam cut-offs both under the proposed structure and as a mean to repair existing ones.