Vai direttamente al contenuto della pagina.
  • Careers
  • Trevi Group
  • Accessibility Statement
Whistleblowing/Segnalazioni
  • Italiano Italiano
    • IT – Policy del Gruppo Trevi
    • IT – Procedura operativa
    • IT – Segnalazioni tramite Lettera/Email Whistleblowing
    • Whistleblowing
  • English English
    • EN – Trevi Group Policy
    • EN – Operating Procedure
    • EN – Reporting by Letter/Email
    • Whistleblowing
  • Espanol Espanol
    • ES – Politica del Grupo Policy
    • ES – Procedimiento Operativo
    • ES – Informes por Carta/Correo
    • Whistleblowing
logo Treviicos
  • Expertise
  • Technologies
  • Projects
  • Services
  • About Us
  • Media
  • Contact Us
    • Contact Us
    • Network
  • Careers
  • Trevi Group
  • Accessibility Statement

Press enter to search or escape to exit

Home / Media Gallery / TREVIICOS completes Herbert Hoover Dike Reach 1 Gap Closure Project
Submenu
  • 110 Broad Street, Financial District, Boston
  • MBTA Charlestown Bus Facility shoreline stabilization project
  • Fenway Center
  • Mosul Dam Project - Maintenance grouting and rehabilitation of the bottom outlet tunnels
  • TREVIICOS completes foundations for the new Boston Children’s Hospital facility
  • TREVIICOS helps to expand MIT campus
  • Echelon Seaport, Boston MA
  • Foundation works for the new Four Seasons One Dalton in Boston
  • TREVIICOS performing ground stabilization along SR83/US 331 highway
  • Turbomix Technique
  • Wolf Creek Dam - Foundation Remediation Project
  • Wolf Creek Dam - A High Priority Dam Remediation
  • New Orleans East Back Levee Enlargement
  • Out there - TREVIICOS People

TREVIICOS completes Herbert Hoover Dike Reach 1 Gap Closure Project

The HHD Reach 1 Gap Closure Project awarded to main contractor TREVIICOS included construction of sections to close the gap between cutoff walls and existing structures at different points around Herbert Hoover Dike, the 143 earthen dike surrounding Lake Okeechobee.

To complete the task TREVIICOS employed two types of cutoff wall technologies: first, cutoff wall by jet grouting abutting the existing structures, a two-phase process combining pre-drilling of the native soils and jet grouting. The pre-drilling, specified to due to the presence of the hard rock layer, consisting of 239 columns with an average depth 55 ft. After completion, the task called for drilling and jet grouting columns down to the design depth.

The second technology, the self-hardening slurry (SHS), developed for the first time by TREVIICOS during the work previously performed as part of the HHD Reach 1 Cutoff wall, was also divided into two phases. After the clamshell excavated down to the rock layer the hydromill took its place and continued excavation down to design depth.

One of the main challenges was to manage logistics between project sites, situated as far as 30 miles from each other, a task TREVIICOS performed in total safety as reflects its superior record

Part of a major rehab project

The rehabilitation works are part of the Army Corps of Engineer’s $870+ million investment in projects and safety measures at Lake Okeechobee to reduce the risk of catastrophic failure and flooding for a large area of South Florida.

Installation of over 50 miles of cutoff wall around the lake, along with replacing old water control structures, commonly known as culverts, are some of the steps being taken to protect the area.

TREVIICOS, in addition to the GAP closure, is now working on the Eastern Section of the lake in the Reach 1 Extension and the MATOC Task Order 2 for a total of over 3.5 million sq. Ft. developing over approximately 12 miles of cutoff wall.

Follow Us
    • twitter
  • Expertise
  • Technologies
  • Services
  • News
  • Events
  • Media
  • About Us
  • Contact Us
  • Network
  • Careers
© 2026 TREVIICOS North America
  • Privacy policy
  • Cookie Policy