Encore Boston Harbor
Encore Boston Harbor

2016 - Boston, MA

Upon completion, this 2.5-billion-dollar casino project will have 27-stories (3 of which are underground), contain 2,900 mostly underground parking spots, house a convention center, retail shops, a luxury resort and spa, restaurants and bars.

The foundation/support of excavation (SOE) work consisted of a 30” thick Slurry Wall (SW) and 48” Load Bearing Elements (LBEs).

Due to the challenging soil conditions and the vicinity of the harbor, the slurry wall was complemented with tiebacks.

Owner Wynn Resort
Geotechnical Engineer GZA (Owner) / GEI (TREVIICOS)
General Contract Suffolk Construction Co.