Upon completion, this 2.5-billion-dollar casino project will have 27-stories (3 of which are underground), contain 2,900 mostly underground parking spots, house a convention center, retail shops, a luxury resort and spa, restaurants and bars.
The foundation/support of excavation (SOE) work consisted of a 30” thick Slurry Wall (SW) and 48” Load Bearing Elements (LBEs).
Due to the challenging soil conditions and the vicinity of the harbor, the slurry wall was complemented with tiebacks.
Owner | Wynn Resort |
Geotechnical Engineer | GZA (Owner) / GEI (TREVIICOS) |
General Contract | Suffolk Construction Co. |