CFA Piles

The technique of constructing piles using Continuous Flight Auger drilling, pumping concrete through the auger stem and vibrating into the fresh concrete either a reinforcement cage or an H beam allows, in proper soil conditions, for quick and inexpensive construction of foundation elements.